Galápagos Schoolhouse
 Log In •  Help •  Schoolhouse •  News •  Home 
 
School: 2004 - AC - AUDIT COORDINATION • Quest AC / INST - 106: INSTITUTIONAL AUDIT 6 • Task INST - 106 -: AUDIT
updated 10/16/2003 10:51:00 PM by Berenice N.
Report: task institucional-106_ Oficial _Estacion Terrena
INPUTS CHECKLIST EARTH STATION OFFICIAL TARIFF CODIGO N # 152 MEASURER 4204350 The Earth station is Located in the Street Miguel of unamundo and av. Of the Navy, it is a calm street and she is not very journeyed. The entrance to the Earth station this oriented to the West (photo 263) and the facade one of the construction this oriented to the South, this surrounded by few constructions, and with a similar height of the others, the form is octágono. When entering we see a glass door, when entering the room we observed all the offices the sides and with glass door transparente(Photo 216,217,218) we can find a floor tile floor, its walls of cement block, knocked down his is of glass, it is a giant species of clarabolla, and it is possible to be observed 4 floresentes lamps, that they illuminate at night and a great center of 1500w is used of time encuando, all the structure is form of octágono, (Photo 214, 215, 219). When entering the first office of Control Master, we can observe its floor of floor tile with a temperature 24°c, fallen down of plaster pressed to 25°c, walls of cement block to 25°c, has glasses I am transparent covers with persianas.(foto 206.207, 208, 210, 213). The equipment that we found is: a Moden satelital(photo 264), 1 moden, to rauter, 2 moden satelite telephone, unit of switch, (Photo 265) analyzing phantom (photo 269) rejol digital(foto 266), direct channel on watch between Galápagos and Guayaquil, DCME(foto control 268), we can observe panels of breakes (photo 270). Soon we entered the Central telephone office (photo 217) is a quarter that always this caught the conditioned air to maintain the equipment in good state, we found the two here digital power station (photo 271.272), 1 radio connects digitalis has a capacity 30 channels marks SEMES Z1E1, TNE is for enlasar with the other Islas(photo 273), suppresor of ecos(photo 274), 64 Kpps (photo 275)una radio tricenal(photo 276), PCM communicates with Baltra-cascajo-Santa Cross, capacity of 60 channels but single it has installed 30 marks ASLMX, digital Power station Alcatel E10B(photo 277,278), the floor is of floor tile with a temperature of 12°c the walls of Block with 13°c and the plaster ceiling pressed in 17°c, we could find a part of the ceiling opened within the office, where the quality of ceiling is observed and type of installation of alambres(photo 279).Luego we followed the runner, and found the room of technologists here where we can observe a glass door, when entering we see the conditioned air, a television, a refrigeradora, micro waves, has transparent windows with blinds, floor of plaster floor tile, knocked down pressed with a temperature mediates of 23 to 24°c, also are floresentes lamps with 4 tubes each lámpara.(Foto 229,230,231,227,228,229,236) soon we entered the kitchen where we found a kitchen electrica, an extract of plaster food, ceiling pressed in adjustments, floor of Floor tile, and walls of block of cemento.(photo 233,234,235). We entered the office of the Station master where we found glass doors, and first plane the secretary with a computer and a printer, the walls of block, floor of floor tile with a temperature average 25°c to 26°c(photo 220) and soon we can observe great véntales where the office of the General Manager is observed all the entrance is of windows, when entering we can observes the conditioned air, a television of cameras, it has glasses with blinds, floor of floor tile, knocked down of pressed plaster, and lamps with floresentes tubes, the temperature average of 26°c to 27°c(Photo 221,222,224,225). When leaving the construction we could realize that in the facade dos(foto257) does not have trees and that facade three and four have trees that are growing and that give shade to the large windows that give towards oficinas(Photo 258,260,261). In Facade three we can find an aluminum door, where one is the three transforming are 50kva each, it is a quarter with cement floor and tiles, the ceiling cement block, like its walls.

File Attachment: Copia_de_INPUTS_CHECKL_Estacion_Terrena.doc

Virtual Schoolhouse Technology Copyright © 1998-2005, EcoSage Corporation
E-mail: webmaster@solarquest.com