School: 2004 - AC - AUDIT COORDINATION • Quest AC / INST - 102: INSTITUTIONAL AUDIT 2 • Task INST - 102 -: AUDIT
updated 9/27/2003 12:48:00 PM by Berenice N.
Report: Task Institucional- Oficial Comando de Policia 102
INPUTS CHECKLIST COMMERCIAL OFFICIAL TARIFF MEASURING CODIGO 683 N # 6622231 (PHOTO 583) The police station is Av.Española and Charles Darwin, is the main street and very journeyed. One is surround by few constructions, the height of the construction is but high that the buildings that surround to him. It has rectangular form and the main facade is oriented to the South (photo 585, 586), when entering we can observe transparent glass doors, floor tile ground and the ceiling is slab (Cement). The building has 2 plants in the one of down we found 5 offices which have transparent glasses with blinds that photo 594 covers with the sun (, 506).cada office has its work parties like computers, computers, printers, fax, communication radios (Photo 498.476, 479.487.488.492.497.499.502) and also found conditioneds air which single use it at time of heat that is of Dic to May, these conditioneds air do not have mark nor data of which it is consumed in KW, (Photo 508, 503, 513). The facilities are not very good (Photo 485), soon raised by 2 cement steps and arrived at a room of espera(Photo 519, 520) where we observed floor of floor tile with cement walls and a glass door is transparent where it gives light. We happened left by hand to the secretary office, a fourth narrow one of cement walls with a window covered with a curtain to protect of the sun, (photo 513, 514, 515). By hand of right this the office of the commander is an ample place, with great windows with blinds floor of floor tile with ceiling of losa(photo 510, 518)., soon we left and we raised by two stairs of madera(580) and above ours we can observe an entrance of natural light put a ceiling and with glasses to the sides and when it is opened it passes much brisa(Photo 522. 523, 579), soon we opened an iron door and we left to the terrace where we can observe the antenna that uses for radios(Foto 483), tanks of Agua(Photo 482) connections in piso(photo 483) are a great terrace that gives the Vista to the sea and the sun beats very hard is slab ceiling (serious cement and a good option for the panels solares(Photo 481). NOTE: We did not find lights in the part of outside, estan the facilities done but without centers? This construction does not have planes.

File Attachment: Copia_de_INPUTS_CHECKLcomercial,_comando_de_policia_oficial.doc

Virtual Schoolhouse Technology Copyright © 1998-2005, EcoSage Corporation
E-mail: webmaster@solarquest.com